APPLICATION JOURNAL

Sign Installation: from selection to application.

Start with the part geometry and bonding surfaces. Record contact area, spring-back, positioning and application pressure. Plan the tape contour and liner handling together, then trial the installation on representative parts.

Does lifting always mean the adhesive is too weak?
Distinguish interface release, coating lift and part spring-back, then inspect surfaces, support and application pressure. These causes require different corrections.